This NRS 465 Topic 6 sample paper plans a standardized handoff from the post-anesthesia care unit to a surgical unit with a bedside safety check, replacing telephone report. It was written for GCU NRS 465, Applied Evidence-Based Project and Practicum, catalog code NRS-465, which nurses take in the RN to BSN. The change is justified with Segall and colleagues' review and Randmaa and colleagues' SBAR study. Tool content was set by nurses from the three items most often missing. Steps are labeled from Day 0 with roles. Training differs for PACU and receiving nurses. Materials are listed, Joint Commission handoff guidance applies and three risks, starting with time, have contingencies.

CourseNRS 465 Applied Evidence-Based Project and Practicum
TopicTopic 6
Paper typeImplementation plan
LengthAbout 1,020 words, 3 pages
FormatAPA 7 student paper
SchoolGrand Canyon University (GCU)
ProgramRN to BSN
UpdatedOctober 2026

Free sample paper for NRS 465 Topic 6

1

Implementation Plan: A Standardized PACU-to-Surgical-Unit Handoff With a Bedside Safety Check

[Author Name]

College of Nursing and Health Care Professions, Grand Canyon University

NRS-465: Applied Evidence-Based Project and Practicum

Topic 6 Assignment

[Instructor Name]

April 12, 2027

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe title names the change precisely, a standardized handoff between the recovery room and the surgical unit with a safety check at the bedside, and signals a plan rather than an argument. From here on the document stops reading like a paper: numbered steps, owners and timing carry the weight. The hospital and units are a composite.
2

Implementation Plan: A Standardized PACU-to-Surgical-Unit Handoff With a Bedside Safety Check

The Change and Why It Is Being Implemented

The project replaces the current telephone report from the post-anesthesia care unit (PACU) to the receiving surgical unit with a standardized handoff: a structured report using a printed and electronic tool organized in SBAR order, given in person at the bedside when the patient arrives, followed by a joint safety check of airway, vital signs, pain, surgical site, drains, intravenous lines and pending orders before the PACU nurse leaves. A baseline review of 40 transfers on the composite 32-bed surgical unit found that 14 reports omitted at least one of the following: the last opioid dose and time, the intraoperative fluid balance, or pending laboratory tests. Handoff failures are a recognized contributor to serious adverse events in general (The Joint Commission, 2017), and postoperative handovers carry particular risk; a systematic review found that they are frequently incomplete and recommended standardized processes, including structured content and face-to-face transfer with the receiving team (Segall et al., 2012). In an anesthesia and recovery setting, introducing SBAR was associated with improved perceptions of communication and fewer incident reports related to communication errors (Randmaa et al., 2014).

What the Handoff Tool Contains

The tool's content was set by the nurses who give and receive these reports, using the three items most often missing in the baseline review as fixed fields. Situation: procedure, surgeon, type of anesthesia, and any complications in the operating room or recovery. Background: allergies, relevant history, home medications held or given, and code status. Assessment: most recent vital signs and trend, level of consciousness, pain score with the last opioid dose and time, nausea, intraoperative fluids in and out, estimated blood loss, urine output, surgical site and dressing, drains with output, and intravenous access. Recommendation: pending laboratory tests or imaging, first postoperative orders due, activity and diet orders, and what to watch for in the next four hours. A field cannot be left blank in the electronic version; the nurse selects not applicable if an item does not apply, so an omission is visible rather than silent.

Implementation Steps

Each step below states the action, the role responsible, what it needs and when it happens relative to go-live, labeled Day 0.

Table 1

Numbered Implementation Steps

StepActionResponsible roleNeedsTiming
1Finalize the handoff tool content with PACU and surgical unit nursesProject lead with two nurses from each unitBaseline omission data; draft toolDay -60 to -45
2Build the electronic version of the tool as a report template in the recordInformatics analystApproved content; test patientsDay -45 to -21
3Approve the process and update the transfer policyPerioperative practice councilDraft policy; toolDay -30
4Train PACU nursesPACU educator30-minute session; simulation with a mock patientDay -21 to -7
5Train surgical unit nurses and charge nursesSurgical unit educator30-minute session; laminated pocket cardDay -21 to -7
6Brief float pool and transport staffNursing supervisor10-minute huddle scriptDay -7 to -1
7Brief anesthesia and surgery teamsProject lead with anesthesia directorOne-page summaryDay -14
8Go-live with super-users on both units, day and evening shiftsPACU and surgical charge nursesSuper-user scheduleDay 0 to Day 14
9Audit 10 handoffs a week for completeness and bedside safety checkProject leadAudit formDay 1 to Day 90
10Review results and revise the toolProject teamAudit data; staff feedbackDay 30, 60, 90

Training by Audience

PACU nurses give the report, so their training covers the content and order of the tool, how to prepare it before transport, and how to handle a receiving nurse who is busy with another patient: the PACU nurse waits, and escalates to the charge nurse after five minutes. Surgical unit nurses receive the report, so their training focuses on asking clarifying questions, completing the joint safety check and declining to accept the handoff until it is complete. Charge nurses learn how to free a nurse to receive a transfer on time and how to review the audit results. Float pool nurses, who may receive a PACU patient on any shift, get a short huddle briefing and the pocket card, since they will not attend the full session. The nurse manager is briefed on the audit and on how to recognize staff who model the process. Each group is trained on the part of the handoff it actually performs, because a single session for everyone would spend most of its time on content half the room will never use.

Materials

Materials are listed by category: the handoff tool in printed and electronic form; a laminated pocket card with the SBAR headings and the safety check items; a one-page policy summary; training slides and a simulation scenario for each unit; an audit form covering tool completion, bedside delivery and each safety check item; and a super-user schedule posted at both nurses' stations.

What this page is doingThe plan is written as numbered steps, each carrying the action, the role responsible, what it needs and when it happens relative to go-live. Training is separated by audience, including the float pool and manager, and each group learns only the part it performs. Materials are listed as categories rather than invented products, which keeps the plan realistic.
3

Risks and Contingencies

Three risks are anticipated. The first is time: bedside handoff takes longer than a phone call, and PACU nurses may be pressured to return to their unit. The plan addresses this by having the PACU charge nurse cover the returning nurse's patients for up to 15 minutes, and by tracking how long handoffs take during the first month. The second is receiving nurse availability: if the surgical nurse is with another patient, the charge nurse or a designated resource nurse receives the handoff and completes the safety check. The third is inconsistent use after the super-users leave. The weekly audit continues for 90 days, results are shared at both units' staff meetings, and the process is added to annual competencies if the 90-day review supports keeping it. If the omission rate does not fall from the baseline of 14 in 40 transfers to fewer than 4 in 40, the team will review the audit forms to see which items are still missed and revise the tool.

Success at 90 days means the new process is simply how transfers happen, not a project that staff are waiting to end.

References

Randmaa, M., Martensson, G., Leo Swenne, C., & Engstrom, M. (2014). SBAR improves communication and safety climate and decreases incident reports due to communication errors in an anaesthetic clinic: A prospective intervention study. BMJ Open, 4(1), Article e004268. https://doi.org/10.1136/bmjopen-2013-004268

Segall, N., Bonifacio, A. S., Schroeder, R. A., Barbeito, A., Rogers, D., Thornlow, D. K., Emery, J., Kellum, S., Wright, M. C., & Mark, J. B. (2012). Can we make postoperative patient handovers safer? A systematic review of the literature. Anesthesia & Analgesia, 115(1), 102-115. https://doi.org/10.1213/ANE.0b013e318253af4b

The Joint Commission. (2017). Inadequate hand-off communication (Sentinel Event Alert, Issue 58). https://www.jointcommission.org/

NRS 465 Topic 6 instructions, in plain terms

Topic 6 in NRS-465 asks students to develop an implementation plan for their project. Strong plans state the change and why it is being implemented, describe the tool or process in enough detail to use, and lay out steps with actions, responsible roles, resources and timing relative to go-live. Students should plan training by audience, since people giving and receiving a handoff need different preparation, list materials by category and anticipate risks with a contingency for each. Whether a budget is required depends on the assignment, and the timeline should be long enough to prepare properly without delaying the change.

How this NRS 465 Topic 6 example is built

On the page it stops looking like a paper. Headings are functional, the steps are numbered, and each step carries the same four things: the action, the role responsible, what it needs, and when it happens relative to the start. Training appears with audiences separated, so the staff who will do the work differently, the float pool who cover shifts and the manager who reviews compliance each get their own content. Materials are listed as categories rather than invented costs: education time, printed or electronic resources, screen changes, audit time. A pilot period is defined with its scope and its end date criteria. A short section says what happens if a step slips, and a table often carries the schedule while the prose explains the reasoning behind the order.

NRS 465 Topic 6 rubric: what Excellent looks like

Faculty reward a plan another team could carry out. An Excellent plan justifies bedside PACU handoff with Segall and colleagues and Randmaa and colleagues and builds the tool from the three items most often missing. Credit goes to steps labeled from Day 0 with roles and resources. The rubric values separate training for PACU nurses who give report and surgical nurses who receive it, under Joint Commission handoff guidance. Strong plans list materials such as a laminated SBAR card. Top marks go to three risks with contingencies, starting with time pressure. Roles are named.

NRS 465 Topic 6 help: mistakes that cost marks

This deliverable punishes essay writing. Paragraphs explaining why the change matters, without numbered work attached to roles, leave the deliverable criterion unfilled however well written they are. Steps that name no owner are the visible symptom, because staff will be educated names no one and schedules nothing. Missing sequence is the second leak: a list of activities with no order tells faculty the writer has not thought about what depends on what. Plans with a single training line lose the education criterion, and plans with no contingency read as untested. Invented budget figures do more harm than stated categories with assumptions. The strongest versions say what would delay the rollout and what the project would do about it.

Get an NRS-465 Topic 6 example written to your instructions

Send the Topic 6 assignment instructions and the rubric from your NRS-465 classroom, plus the change you are implementing and the constraints your setting imposes. We write a custom example to those criteria, built as a working plan with steps, owners and resources, and return it in 24 to 48 hours. The first custom sample is free.

More NRS 465 papers and RN to BSN samples

NRS 465 Topic 6 questions, answered

Does the plan have to include a budget?

Check your assignment instructions, since some sections ask for a cost estimate and others do not. Where one is required, work in categories with your assumptions written down: education hours at a stated number of staff, materials, system configuration time, audit time. Naming what you assumed is stronger than a confident total, and it protects you from a figure you cannot support.

Do I actually have to implement the change?

That depends entirely on your section and your site, and it is a question for your instructor and your preceptor rather than for us. Some projects stay at proposal, some run a small pilot with facility approval. Either way the approvals, the hours and the site permissions are your own. What a sample shows is the written plan, which looks the same whether or not it is carried out.

How long should the implementation timeline be?

Long enough to be believable inside your setting. Education alone usually takes several weeks to reach every shift, and a pilot needs enough time for the measure to move. A four week plan that covers configuration, training, go-live and audit is not credible on most floors. Say what drives the length, then match it to the evaluation window you will define in the next topic.

Where can I find a free NRS 465 Topic 6 sample paper?

The implementation plan for NRS 465 Topic 6 for NRS 465 Topic 6 is reproduced here: the change and why, what the tool contains, implementation steps, training by audience, materials and risks and contingencies. Paste in your NRS 465 Topic 6 prompt and a free plan follows.

Do I actually have to implement the change in NRS 465 Topic 6?

That depends on your instructions. Some sections require implementation during the practicum, while others grade the plan alone.