| Course | DNP 835 Patient Outcomes and Sustainable Change |
|---|---|
| Topic | Topic 7 |
| Paper type | Sustainability embedding plan |
| Length | About 990 words, 3 pages |
| Format | APA 7 student paper |
| School | Grand Canyon University (GCU) |
| Program | DNP |
| Updated | October 2026 |
Free sample paper for DNP 835 Topic 7
Built to Run Without Me: Moving Each Part of the Opioid Monitoring Change Into a Structure That Already Exists, and the One Part That Would Not Move
[Author Name]
College of Nursing and Health Care Professions, Grand Canyon University
DNP-835: Patient Outcomes and Sustainable Change
Topic 7 Assignment
[Instructor Name]
July 17, 2028
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Built to Run Without Me: Moving Each Part of the Opioid Monitoring Change Into a Structure That Already Exists, and the One Part That Would Not Move
What Has to Continue
Four parts of the surgical unit's change have to outlive the project, which closes in December: monitoring of breathing and oxygen for every patient the PRODIGY score flags as high risk, with sensor care by patient care technicians and first-line alarm review by central monitoring technicians; the sedation-scoring prompt before every as-needed opioid dose; pharmacist review of opioid and sedative combinations within 24 hours of surgery; and the weekly measurement that shows whether all three are happening. Sustainability here means that after a defined period these practices are still delivered, the behavior changes are maintained, and the program may adapt while it keeps producing benefit (Moore et al., 2017). The plan below does not assign any of this to the project lead. Each part is moved into a structure the hospital already runs, so it continues because the structure continues.
Each Element and the Structure That Now Holds It
Table 1
Where Each Element of the Change Now Lives
| Element | Existing structure it moves into | Owner by role |
|---|---|---|
| Sensor application and repositioning checks | Patient care technician job description, revised and signed August 25 | Unit nurse manager |
| First-line capnography alarm review | Central monitoring technician standard work and competency checklist | Central monitoring supervisor |
| Risk scoring and escalation decisions | Surgical unit registered nurse competency list, reviewed annually | Unit educator |
| Sedation-scoring prompt | Permanent record build, maintained under informatics change control | Nurse informaticist |
| Pharmacist co-sedative review | Clinical pharmacy daily worklist for surgical units | Clinical pharmacy manager |
| Weekly and monthly measures | Monthly unit quality dashboard produced by the quality department | Quality analyst assigned to surgical services |
| Review of results | Standing agenda item at the monthly surgical services quality committee | Committee chair |
| Training for new staff | Hospital and unit orientation for nurses, technicians and monitoring staff | Unit educator and central monitoring supervisor |
Table 1 lists each element, the existing structure it has moved into and the role that owns that structure.
Why Existing Structures, Not New Ones
Every element could have been sustained by creating something new: a monitoring working group, a separate monthly report, a dedicated training day. Each new structure would need its own champion, and when that person moved on it would stop. Existing structures already have owners, schedules and budgets. Writing the sensor task into the technician job description means that anyone hired into the role after the project will be oriented to it and evaluated on it without anyone remembering the project. Adding the three process measures to the monthly unit dashboard means they arrive in the same report the manager already reads, with no one having to run a query. Putting review on the surgical services quality committee's agenda means results are discussed by people with authority to act, at a meeting that already happens. Reviews of sustainability have found that programs are more likely to last when they fit existing routines and organizational structures rather than depending on the individuals who introduced them (Scheirer, 2005). Integrating a change into ongoing operations, rather than preserving it as a separate project, is also what allows it to be adapted as the unit changes (Chambers et al., 2013).
Training Through Onboarding
New staff will not receive a separate capnography class. The unit orientation checklist for registered nurses now includes risk scoring, sensor troubleshooting, sedation scoring and escalation, signed off by the preceptor during the first two weeks. The technician orientation includes sensor application and repositioning. The central monitoring orientation includes the capnography waveform module and the alarm escalation rules. Annual competency review for all three roles includes the relevant items. Once these checklists are in place, training happens every time someone is hired, whether or not anyone remembers why it was added.
Travel and float nurses, who do not go through unit orientation, are the gap in this approach. The staffing office's float checklist for the surgical unit now requires a 10-minute sensor and escalation review, led by the charge nurse when the float nurse arrives for a first shift, recorded on the same checklist the office already keeps for every float assignment.
The Element That Could Not Be Embedded
One element depends on a single person, and the plan says so. The capnography monitors store their alarm logs and episode data locally, and the only way to extract the monthly figures for the second process measure and for alarm burden is a manual export and cleanup that one clinical engineering technician learned during the project. The quality department's dashboard cannot pull the data automatically, and the vendor's reporting module that would allow it is a separate purchase that was not approved this budget year.
If that technician left within a year, three things would happen. The monthly capnography measure would stop appearing on the dashboard, probably without anyone noticing for a month or two. Alarm limit drift, which the export is used to check, would go unmonitored. And the committee would lose the data it needs to judge whether monitoring of high-risk patients is still happening. The mitigation is partial: the export steps are written as a one-page procedure stored in clinical engineering's shared procedures, a second technician will be trained by September, and the vendor reporting module has been submitted for next year's capital budget with the dependency named as the reason. Until the module is bought, this element is only as durable as two people's employment.
What the Project Lead Still Does, and When It Stops
Until December, I attend the monthly committee review and help the quality analyst interpret the first dashboards. After December, I have no assigned role. The test of the plan is simple: if I left the hospital in January, every element in Table 1 would still have an owner, a schedule and a place where its results are seen. The one exception is named above, with the date by which it should be resolved.
References
Chambers, D. A., Glasgow, R. E., & Stange, K. C. (2013). The dynamic sustainability framework: Addressing the paradox of sustainment amid ongoing change. Implementation Science, 8, Article 117. https://doi.org/10.1186/1748-5908-8-117
Moore, J. E., Mascarenhas, A., Bain, J., & Straus, S. E. (2017). Developing a comprehensive definition of sustainability. Implementation Science, 12, Article 110. https://doi.org/10.1186/s13012-017-0637-1
Scheirer, M. A. (2005). Is sustainability possible? A review and commentary on empirical studies of program sustainability. American Journal of Evaluation, 26(3), 320-347. https://doi.org/10.1177/1098214005278752
Reading the GCU DNP 835 Topic 7 instructions
Topic 7 in DNP-835 asks students to plan for sustaining a practice change after the project ends. Strong plans list what has to continue and move each element into a structure that already exists, such as orientation, committee reviews or role descriptions, with owners named by role rather than by person. Students should explain why existing structures last longer than new ones and describe how training will continue for new staff. The plan should name honestly any element that cannot yet be embedded and say what the project lead still does and when that role stops, drawing on the sustainability literature. A table of elements, structures and owning roles is the clearest format.
How this DNP 835 Topic 7 example is built
The finished example is designed to work without its author. Rather than assigning ongoing responsibility to the project lead, it moves each element into a structure that already exists: the new step is written into a job description and therefore into orientation for anybody hired afterward, the measure joins a report the unit already produces monthly, and review moves onto an established committee agenda rather than a new meeting. Training for new staff is handled by the existing onboarding process. The example is honest about the one element that could not be embedded and remains dependent on a single person, and it says what would happen if that person left within a year.
DNP 835 Topic 7 rubric: what Excellent looks like
Faculty reward each element placed in a structure that already runs. An Excellent plan tables four elements, each with the existing structure and owning role, such as the monthly committee review for monitoring data. Credit goes to rejecting new working groups, with Scheirer and Moore and colleagues on why programs fade. The rubric values moving training into the orientation checklist and naming owners by role. Strong plans cite Chambers and colleagues on adapting to change. Top marks go to admitting that monitor data extraction depends on one person and dating the lead's exit.
Common DNP 835 Topic 7 mistakes, and how to avoid them
Sustainability plans assigning ongoing responsibility to the project lead are the standard version and fail the moment that person moves. A second failure is proposing a new recurring meeting, which competes with everything else on a calendar and is the first thing dropped. Marks also go for plans with no route for new staff, since turnover alone will dismantle a change within two years. Owners named as individuals rather than roles create a dependency the plan was meant to remove. Reviews scheduled with no stated action at each point produce a date and no consequence. Plans claiming everything is embedded usually have not examined the hardest element. Plans that never mention staff turnover assume a team which will not exist in two years.
Get a DNP-835 Topic 7 example written to your instructions
Send the DNP-835 Topic 7 instructions and the rubric your classroom posts, with the change your section assigned. We write a custom example to those criteria, embedding elements into existing structures, routing training through onboarding, naming owners by role and identifying what could not be embedded, in 24 to 48 hours. The first is free.
More DNP 835 papers and DNP samples
- DNP 835 Topic 1: Outcome and Process Measure Separation
- DNP 835 Topic 2: Improvement Method Evaluation Logic
- DNP 835 Topic 3: Stakeholder and Resistance Analysis
- DNP 835 Topic 4: Implementation Plan with Milestones
- DNP 835 Topic 5: Cost and Competing Priorities DQ Pair
- DNP 835 Topic 6: Run Chart and Feedback Design
- DNP 835 Topic 8: One Year Later Evaluation
- DNP 836A Topic 7: Learner Assessment Plan
- DNP 830 Topic 7: Results for a Practice Audience
- DNP 837A Topic 7: Curriculum Revision Proposal
- DNP 825 Topic 7: Population Program Proposal
DNP 835 Topic 7 questions, answered
What does embedding actually mean?
Moving the change into something that runs whether or not anybody is thinking about it. A step written into a job description reaches every future hire through orientation. A measure added to a report that already goes out monthly gets produced without anyone deciding to produce it. Anything that requires somebody to remember is maintenance, and maintenance decays.
Why name owners by role?
Because people move. A plan assigning the monthly review to a named individual lasts exactly as long as that person stays in post, and the average is shorter than the change needs. Naming the role means the responsibility transfers with the job, and it also means the plan can be read by somebody who does not know the current staff.
Is it a weakness to admit something is not sustainable?
No, and every honest plan has one such element. Some part of a change usually depends on a particular person's knowledge or relationships and cannot be written into a structure. Naming it, and stating what would happen if that person left within a year, is far more useful than a plan claiming everything is secured.
Where can I find a free DNP 835 Topic 7 sample paper?
You can read the whole embedding plan here: what has to continue, each element and the structure that holds it, why existing structures, training through onboarding, the element that could not be embedded and when the lead's role stops. Paste in your DNP 835 Topic 7 prompt and a free plan follows.
Why name owners by role in DNP 835 Topic 7?
Because people move. A plan that assigns the monthly review to the quality analyst role survives a resignation; one that names a person does not.