| Course | MKT 650 Services Marketing |
|---|---|
| Topic | Topic 7 |
| Paper type | Service blueprint |
| Length | About 960 words, 2 pages |
| Format | APA 7 student paper |
| School | Grand Canyon University (GCU) |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 650 Topic 7
Twenty-Five Minutes at the Counter and a Car Nobody Knew Was Clean: A Service Blueprint of an Airport Car Rental
[Author Name]
Colangelo College of Business, Grand Canyon University
MKT-650: Services Marketing
Topic 7 Service Blueprint
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Twenty-Five Minutes at the Counter and a Car Nobody Knew Was Clean: A Service Blueprint of an Airport Car Rental
Why Blueprint the Rental
A composite car rental company's location at a regional airport has the lowest satisfaction scores in its network, and complaints center on waiting and on disputes over damage at return. Managers have tried adding counter staff on Fridays without much improvement. This paper blueprints the service from the customer's booking to the car's return, to show where the waits and disputes originate, including in parts of the operation customers never see. All times are illustrative.
The Form of the Blueprint
Shostack (1984) introduced service blueprinting as a way to map a service the way an engineer maps a process, showing every step, the time each takes and the points where it can fail. Bitner et al. (2008) refined the technique into the form most used today: horizontal bands for physical evidence, customer actions, frontstage employee actions, backstage employee actions and support processes, separated by three lines. The line of interaction divides the customer from frontstage staff; the line of visibility divides what the customer sees from what happens out of sight; and the line of internal interaction divides frontline staff from the support systems they depend on. The finished blueprint is a single wide diagram; this paper describes it band by band and step by step.
The Customer's Path
The customer's path runs left to right in six stages: booking online, riding the shuttle from the terminal, checking in at the counter, finding the car in the lot, using the car, and returning it. Table 1 summarizes each stage across the bands, with the main wait at each.
Table 1
The Rental Blueprint Summarized by Stage, Illustrative
| Stage | Physical evidence | Customer action | Frontstage | Backstage and support | Typical wait |
|---|---|---|---|---|---|
| Booking | Website and confirmation email | Books and pays | None | Reservation system holds a car class | None |
| Shuttle | Shuttle bus and signage | Rides to the rental center | Driver | Dispatch schedules buses | About 12 minutes |
| Counter | Counter, queue, paperwork | Waits, shows license, signs | Agent assigns a car | Agent checks the clean-car list, updated every two hours | About 25 minutes on Friday evenings |
| Lot | Lot signs, car | Finds car, checks it | Lot attendant at exit | Lot crew cleans and records cars | About 5 minutes |
| Trip | The car | Drives | None | Roadside assistance on call | None |
| Return | Return lanes, receipt | Drops car, leaves for terminal | Attendant scans car | Damage inspection after the customer leaves | About 8 minutes |
Fail Point One: The Clean-Car Handoff
Beneath the counter, the blueprint shows a handoff across the line of internal interaction. The lot crew cleans returned cars and records each one as ready in the fleet system, but that system updates the counter's list only every two hours. At busy times, agents cannot see which cars are clean, so they assign cars from the last list and wait while an attendant radios to check, or they assign a car that turns out still to be dirty and must reassign it. Much of the 25-minute Friday evening wait comes from this handoff, not from too few agents, which explains why adding staff helped little. The blueprint marks it as a fail point.
Fail Point Two: Inspection Out of Sight
At return, the attendant scans the car and prints a receipt, and the customer leaves for the shuttle. The damage inspection happens afterward, below the line of visibility. When damage is found, the customer learns of it days later by email, with photographs they did not witness. Many dispute the charge, believing the damage was there at pickup, and the location has no photographs from pickup to settle the question. The blueprint marks this as a second fail point.
The Longest Wait
The diagram circles the counter wait, about 25 minutes on Friday evenings, as the longest. It is also the wait customers find hardest to accept, because it comes after a flight and a shuttle ride, when they are tired and can see cars waiting in the lot through the window.
Why Adding Counter Staff Missed
Managers responded to the Friday wait by adding two agents, which is the fix the frontstage view suggests. The blueprint shows why it helped little. With more agents and the same two-hour list, more agents simply waited on the same radio checks. The constraint was not the number of people at the counter but the information they could see. A blueprint that stopped at the line of visibility, showing only what customers experience, would have reached the same mistaken conclusion the managers did.
Measuring the Change
After the changes, the location will track three measures: median counter time on Friday evenings, the share of cars reassigned at the counter because they were not ready, and the share of damage charges disputed. If counter time falls but disputes do not, the return inspection is not being done with customers present. If disputes fall but counter time does not, the clean-car list is still lagging. Each measure points back to one fail point on the blueprint.
Recommendations
The blueprint points to fixes at the fail points rather than at the counter. Connect the lot crew's handheld devices directly to the counter's list, so a car appears as ready the moment it is cleaned. Photograph every car at the exit gate during pickup, with the customer present, and do the damage inspection in the return lane with the customer before they leave, so both sides see the same evidence. Bitner (1992) emphasized that physical evidence shapes how customers judge a service; a shared photograph at pickup and return is evidence both parties can trust. Both fixes cost less than the two extra Friday agents the location already pays for, and both address problems that customers feel but cannot see the cause of.
References
Bitner, M. J. (1992). Servicescapes: The impact of physical surroundings on customers and employees. Journal of Marketing, 56(2), 57-71. https://doi.org/10.1177/002224299205600205
Bitner, M. J., Ostrom, A. L., & Morgan, F. N. (2008). Service blueprinting: A practical technique for service innovation. California Management Review, 50(3), 66-94. https://doi.org/10.2307/41166446
Shostack, G. L. (1984). Designing services that deliver. Harvard Business Review, 62(1), 133-139.
What the MKT 650 Topic 7 instructions ask for
Topic 7 in MKT-650 asks students to build a service blueprint. Strong blueprints use the standard bands and dividing lines, follow the customer's path from start to finish and show frontstage, backstage and support activity beneath each step, with times. Students should identify fail points across internal handoffs and below the line of visibility, explain why fixes aimed only at what customers see can fail, recommend changes at the fail points and define measures that trace back to each one.
How this MKT 650 Topic 7 example is built
The finished blueprint is a single wide diagram in five horizontal bands: physical evidence, customer actions, frontstage employee actions, backstage actions and support processes. Three lines divide them, the line of interaction, the line of visibility and the line of internal interaction, following the form G. Lynn Shostack introduced and later researchers refined. The customer's path runs left to right from booking online through the shuttle, the counter, the lot, the trip and the return. Beneath the counter, the diagram shows that agents cannot see which cars have been cleaned, because the lot crew updates a separate system every two hours. That handoff is marked as a fail point. So is the return, where damage inspection happens out of the customer's sight. Waits carry illustrative times, and the longest, about twenty-five minutes at the counter on Friday evenings, is circled.
MKT 650 Topic 7 rubric: what Excellent looks like
Faculty reward a blueprint that finds problems below the line of visibility. An Excellent blueprint follows Shostack and Bitner, Ostrom and Morgan, with five bands and three lines summarized by stage. Credit goes to marking the two-hour clean-car list as a fail point that explains the 25-minute Friday wait. The rubric values showing why extra counter agents helped little. Strong blueprints mark the out-of-sight damage inspection and use Bitner's servicescape idea for shared photos. Top marks go to measures that each point back to one fail point.
MKT 650 Topic 7 help: mistakes that cost marks
A flowchart of customer steps with nothing drawn below the line of visibility is the version that loses most, because the blueprint's value lies in showing the work customers never see and how it produces what they do. Blueprints mapping every customer segment at once blur into a diagram nobody can use, and graduate markers expect the segment named. Many drafts omit support processes, although the two-hour system update causes the counter's worst failures. Fail points marked with no cause beneath them repeat complaints rather than explaining them. Physical evidence is frequently left off entirely, and it is what the customer uses to judge each step. A document that ends with the diagram and proposes no redesign has described the service without improving it, which many rubrics for this topic treat as incomplete.
Get an MKT-650 Topic 7 example written to your instructions
Send the MKT-650 Topic 7 instructions and the rubric provided in your classroom, with the service or case your section assigned. We write a custom example to those criteria, with one segment mapped across all five bands, the three lines drawn, fail points traced to causes below the line, waits timed and steps redesigned, in 24 to 48 hours. The first one is free.
More MKT 650 papers and MS in Marketing samples
- MKT 650 Topic 1: Service Characteristics Analysis
- MKT 650 Topic 2: Service Quality Gap Diagnosis
- MKT 650 Topic 3: Servicescape Evidence Audit
- MKT 650 Topic 4: Capacity and Demand Plan
- MKT 650 Topic 5: Waiting Experience Dq Post
- MKT 650 Topic 6: Recovery Paradox Critique
- MKT 650 Topic 8: Service Redesign Proposal
- MKT 462 Topic 7: Budget Reallocation Memo
- MKT 445 Topic 7: Executive Research Report
- MKT 443 Topic 7: Post-launch Usage Review
- MKT 315 Topic 7: Distribution and Promotion Alignment
MKT 650 Topic 7 questions, answered
What is a service blueprint?
A diagram of a service process that shows, in parallel bands, what the customer does, what frontstage employees do in view of the customer, what backstage employees do out of view, and the support systems behind them, with physical evidence along the top. G. Lynn Shostack proposed the method as a way to design services deliberately. The example uses the standard bands and lines for one airport rental.
What is the line of visibility?
The line on a blueprint separating actions the customer can see from those performed out of sight. Everything above it shapes the customer's direct experience; everything below it shapes that experience indirectly. Many service failures originate below the line and surface above it, as the rental counter's dirty-car problem does. Drawing the line explicitly lets a designer trace a visible complaint back to its hidden cause.
How does a blueprint differ from a customer experience map?
An experience map usually follows the customer's steps, thoughts and feelings without showing the organization's internal work. A blueprint includes that internal work, the backstage actions and support processes, and connects it to each customer step. The two are complementary, and many design teams draw both. The example draws a blueprint because the rental's problems begin in systems and handoffs that customers never see.
Where can I find a free MKT 650 Topic 7 sample paper?
The service blueprint is printed here in full: why blueprint, the form, the customer's path, both fail points, the longest wait, why extra staff missed, measuring the change and recommendations. Describe the service process and we will blueprint it at no charge.
Why did adding counter staff not help in MKT 650 Topic 7?
The constraint was information, not people. Agents could not see which cars were clean because the lot crew's list updated only every two hours, so more agents waited on the same radio checks.