HCA 610 Topic 1 analysis scoping memo example

Essential Health Care Business Analysis Grand Canyon University Free custom sample in 24 to 48h

This HCA 610 Topic 1 sample paper is an analysis scoping memo that turns a finance chief's question, whether bringing inpatient dialysis in house would save money, into a figure, a deadline and a threshold. It was written for GCU HCA 610, Essential Health Care Business Analysis, the course listed as HCA-610 in the Grand Canyon University MS in Health Care Administration. The memo quotes the request, shows the several analyses its wording could mean and names the decision behind it: renew a vendor contract or give 180 days' notice before a November capital committee. It fixes scope to intermittent hemodialysis over five years, lists four assumptions with the direction each biases the result, and promises one figure with a $250,000 threshold set before any numbers exist.

CourseHCA 610 Essential Health Care Business Analysis
TopicTopic 1
Paper typeAnalysis scoping memo
LengthAbout 890 words, 2 pages
FormatMemo with APA 7 references
SchoolGrand Canyon University (GCU)
ProgramMS in Health Care Administration
UpdatedSeptember 2026

Free sample paper for HCA 610 Topic 1

1

Memorandum

To: Chief Financial Officer, Bristlecone Regional Medical Center

From: [Author Name], Senior Financial Analyst

Date: [Date]

Re: Scope of the inpatient dialysis in-house analysis

 

The Request as It Arrived

Your email of September 8 asked: "Can you find out whether bringing dialysis in house would save us money? The contract is up next year." This memo sets out how I propose to answer that, so that we agree on the question before I spend time on the numbers. As written, the request could mean several different analyses. "Dialysis" could include intermittent hemodialysis, continuous renal replacement therapy in the intensive care unit and peritoneal dialysis. "Save money" could mean lower cost per treatment, lower total cost in the first year or lower cost over the life of the equipment we would have to buy. And "in house" could mean a full hospital program or a hybrid in which we employ the nurses and lease the machines. Each version produces a different number.

The Decision Waiting on the Answer

The decision is whether to renew the three-year contract with our dialysis vendor, which expires on June 30, 2027, or to give notice and build our own program. The contract requires 180 days' notice, so the decision must be made by December 31, 2026. In practice it must be made earlier, because an in-house program needs capital approval and the capital committee meets on November 18. You own the decision, with the chief nursing officer, whose nurses would staff the program, and after consulting the nephrology group, whose physicians order every treatment. The analysis therefore needs to be finished and reviewed by November 4. An answer delivered after the committee meets would be an expense rather than an input.

Scope

I propose the following boundaries, with the reason for each exclusion.

Inside the scope: intermittent hemodialysis for hospital inpatients, whether delivered in the dialysis room on the fourth floor or at the bedside in the intensive care unit. This is the service the vendor provides and bills per treatment, about 2,900 treatments in the fiscal year just ended at the current rate of $708.

Outside the scope: continuous renal replacement therapy, which our ICU nurses already run with our own machines, so it would not change; peritoneal dialysis, which is rare here and done by floor nurses; and outpatient dialysis, which we do not provide. I also exclude the nephrologists' professional fees, which they bill separately and which do not change under either option.

Period: five fiscal years, 2028 through 2032, which matches the useful life of the equipment an in-house program would need and a typical renewal term.

What this page is doingEach exclusion carries its reason, so a reader who disagrees can see which part of the analysis would change.
2

Assumptions I Will Have to Make

Four inputs will not be available from our own records, and each will push the result in a known direction.

Volume. Treatments grew from about 2,510 to 2,900 over four years. I will start from the current 2,900, hold it flat for fiscal 2028 and assume 3 percent annual growth after that, below our recent pace; national data show dialysis-requiring acute kidney injury rising in step with sepsis and respiratory failure (Hsu et al., 2016), so volume is more likely to rise than fall. Assuming slower growth makes the in-house option look slightly worse, because the in-house program has more fixed cost to spread.

Nurse staffing. I will assume we can hire dialysis-trained nurses at our staff wage. If we must use agency nurses, the in-house option looks better on paper than it would be, so I will also test an agency share.

Renewal price. The vendor has quoted $740 per treatment for the renewal, a 4.5 percent increase, with the same escalator each year. That quote may fall in negotiation, which would make renewal look better.

Indirect costs. Our cost accounting system allocates overhead by square footage and would assign the program a share of costs that do not change whichever option we choose. I will leave allocated overhead out and count only costs that change, which is the right basis for a make-or-buy decision (Gapenski & Reiter, 2016).

What the Analysis Will Deliver

The analysis will produce one figure: the difference in annual cost between the in-house program and the renewed contract, in dollars, for the first full year and over five years, together with the cost per treatment under each option at expected volume. It will also report the volume at which the two options cost the same, since the in-house program is mostly fixed cost and the contract is entirely variable.

I propose that the recommendation change at $250,000. If the in-house program is expected to save less than $250,000 a year in its first full year, I will recommend renewal, because a smaller saving does not justify the capital, the start-up cost and the clinical risk of running a new service. If it saves more, I will recommend giving notice. Setting the threshold now, before the numbers exist, keeps the decision rule honest.

What I Need From You

Please confirm the scope and the $250,000 threshold, or change them, by September 19. I will also need your permission to ask the vendor for monthly treatment logs, and introductions to the nurse recruiter and the biomedical engineering manager. Accurate cost comparisons depend on counting the resources each option actually uses rather than relying on charges or allocations (Kaplan & Porter, 2011), and those three sources are where the actual resource figures sit.

References

Gapenski, L. C., & Reiter, K. L. (2016). Healthcare finance: An introduction to accounting and financial management (6th ed.). Health Administration Press.

Hsu, R. K., McCulloch, C. E., Heung, M., Saran, R., Shahinian, V. B., Pavkov, M. E., Burrows, N. R., Powe, N. R., & Hsu, C. Y. (2016). Exploring potential reasons for the temporal trend in dialysis-requiring AKI in the United States. Clinical Journal of the American Society of Nephrology, 11(1), 14-20. https://doi.org/10.2215/CJN.04520415

Kaplan, R. S., & Porter, M. E. (2011). How to solve the cost crisis in health care. Harvard Business Review, 89(9), 46-52.

Reading the GCU HCA 610 Topic 1 instructions

Topic 1 of HCA-610 asks graduate students to define a business question worth analyzing at a hospital, practice or health system. A typical memo explains the problem, states the question, identify the stakeholders and decision makers, set the scope and outline the data and methods they will use. The strongest memos begin with the request as it was actually made and show the work of translating it into something measurable. Students should name the decision the analysis serves, who makes it and when, fix boundaries with reasons for each exclusion, list the assumptions they expect to make and state the figure the analysis will deliver, supported by health care finance sources.

How the HCA-610 Topic 1 example is put together

The finished memo begins with the request as it arrived, quoted in the words the requester used, since most of the analytical work sits in translating it. It names the decision waiting on the answer, who makes that decision and when they need it, because a question with no deadline and no owner produces a report nobody reads. The scope is then fixed: which service, which time period, which patient population, and what is deliberately left out. Assumptions are listed where data will not be available, each with the direction it biases the result. The memo closes by stating what figure will be produced, in what units, and the threshold at which the recommendation would change.

Where the marks sit in the HCA 610 Topic 1 rubric

GCU's rubric for the scoping memo rewards precision before calculation. Excellent memos quote the request, show how its wording could support different analyses and choose one with reasons. Credit goes to naming the decision, its owner and its deadline, since timing decides whether an analysis is useful. The rubric values explicit scope with each exclusion justified and a list of assumptions that states which way each could bias the result. The highest level names the exact figure and units the analysis will produce and sets a decision threshold in advance, so that the numbers cannot quietly reshape the rule used to judge them.

Common HCA 610 Topic 1 mistakes, and how to avoid them

Marks here follow the translation, and versions that skip it are visible in the opening paragraph. A memo restating the request as a topic, without converting it into something a figure could settle, has agreed to do work nobody has defined. Scoping that names no decision produces a report the requester files, since nothing turns on it either way. Assumption lists without a direction attached tell a reader that estimates were made and nothing about which way they lean. Boundaries left open invite an analysis that grows until the deadline stops it. The reliable deduction at this level is a memo ending in a call for further study, which postpones the decision the request was raised to support.

Get an HCA-610 Topic 1 example written to your instructions

Send us the HCA-610 Topic 1 instructions, the rubric posted in your classroom and the request or scenario you were given. We write a custom example against those criteria, with the request quoted, the decision and its owner named, assumptions carrying their direction and the figure specified in advance, in 24 to 48 hours. The first one is free.

More HCA 610 papers and MS in Health Care Administration samples

HCA 610 Topic 1 questions, answered

What makes a business question different from a topic?

A topic names a subject and a business question names something a figure can settle. Costs in the emergency department is a topic. Whether the department covers its variable costs at current volume is a question, because a single number answers it and somebody is waiting on that answer to decide.

Do I need real data to scope an analysis?

No, but you do need to say where each figure would come from and what you would do when it turns out to be unavailable. A scoping memo written against invented data is still useful if the sources are named and the substitutions are visible. One written as though every number exists is the version that fails when somebody goes looking.

How precise does the answer have to be?

Precise enough to fall clearly on one side of the threshold that matters, and no more. An analysis carried to the dollar when the decision turns on whether a service line clears its own costs has spent effort where nothing was at stake. Saying in advance how close is close enough keeps the work proportionate to the choice.

Where can I find a free HCA 610 Topic 1 sample paper?

This page holds the complete scoping memo, with the request as it arrived, the decision and deadline, the scope, four assumptions and their direction, the figure and threshold, and what the analyst needs. Share the request you were given for a free worked memo.

Why set the threshold early in HCA 610 Topic 1?

A threshold chosen after the numbers arrive can be bent to fit them. Setting $250,000 before the analysis keeps the decision rule honest and tells the requester in advance what result would change the recommendation.